0The opportunity
Opportunity nameOne opportunity per board.
The request, as receivedIn the requester's words, with the date.
Board ownerThe person who keeps this board current and calls each checkpoint.
Board version and dateUpdate at every checkpoint.
1Reality test: eight questions
Mark each test Confirmed (known, supports the work), Condition (unknown or partial, resolvable by a named date) or Blocked (known, rules the work out as framed).
Eight tests before the first diagram
| Test | State | Evidence | Owner | Resolve by | If unresolved |
| 1. Named business outcome | | | | | |
| 2. Accountable sponsor | | | | | |
| 3. Route to purchase or authorise | | | | | |
| 4. Budget envelope, even order of magnitude | | | | | |
| 5. Decision criteria known | | | | | |
| 6. Capability available, on both sides | | | | | |
| 7. Timeline fits the decision and the delivery | | | | | |
| 8. Custom delivery genuinely needed | | | | | |
All confirmed: proceed to design. Conditions open: fund a short discovery to resolve them. Any test blocked: no-go, with the reason recorded (section 7).
2Budget-scope decision
- A budget envelope exists, even at order-of-magnitude level.
- The estimate includes testing, migration, security, operations handover and support.
- The basis of the estimate is recorded.
Is the mismatch material? It is material when the gap remains after obvious contingency is removed, closing it would cut work the outcome depends on, and independent estimates agree.
If the mismatch is material, the sponsor chooses one move
| Move | Chosen? | What changes | Consequence accepted by the sponsor |
| Change the budget (committed, not hoped for) | | | |
| Reduce the outcome (each phase stands alone) | | | |
| Change the intervention (see section 4) | | | |
| Pause or stop (see section 6) | | | |
Ruled out: silently compressing scope, quality, effort or controls to make the numbers meet. Any removed work is removed on the record.
3Authority Map
Name people, not departments. Record evidence that each person has accepted the role.
Roles around the decision
| Role | Named person | What they decide | Evidence of acceptance | Gap and action |
| Sponsor (required) | | | | |
| Budget holder (required) | | | | |
| Decision path (required): each approval step | | | | |
| Operating owner | | | | |
| Technical authority | | | | |
| Procurement authority | | | | |
| Users and possible blockers | | | | |
Any required role missing: the work is still an exploration. Run it with a small fixed budget, a question to answer and an end date.
4Intervention Selection Matrix
Score realistic options 0 (poor) to 3 (strong), with a one-line reason. Start at the top of the ladder: leave untouched, buy, configure, integrate, orchestrate, extend, build. Move down only when evidence rules out the option above.
Nine criteria
| Criterion | Leave | Buy | Configure | Integrate | Orchestrate | Extend | Build |
| Differentiation | | | | | | | |
| Fit | | | | | | | |
| Time | | | | | | | |
| Total cost over life | | | | | | | |
| Risk | | | | | | | |
| Control | | | | | | | |
| Data | | | | | | | |
| Integration | | | | | | | |
| Exit | | | | | | | |
- If the capability is not differentiating, build has an exceptional, written reason.
- Total cost includes running, support and change, not only creation.
- Where several new agents are proposed, one governed agent calling existing deterministic services has been considered.
5Hard-Gate Readiness Board
Build it from the source document, clause by clause, on day one. Status: Held Obtainable before the deadline Cannot be met
One row per gate
| Gate | Source clause | Evidence needed | Lead time | Owner | Status | Action |
| Example: reference of a stated type | Section and clause | Signed letter matching the wording | Two to three weeks | Named person | Obtainable | Request today |
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |
Any "cannot be met" goes straight to a decision: decline, partner honestly, or seek a formal exception for an internal gate. It never goes on a to-do list.
Procurement rules differ by buyer and jurisdiction and change over time. Check the request documents and official sources. General guidance, not legal or procurement advice.
6Proceed-Pause-Stop Register
Write it before the first checkpoint. Outcomes: Proceed, Pause (with a date), Reframe, Stop.
Stopping criteria
| Condition | Signal | Threshold | Checkpoint | Owner | If breached | Decision and date |
| Example: sponsor in place | Accepted in writing | Confirmed by end of discovery | Discovery close | Delivery lead | Stop, or pause two weeks | |
| | | | | | |
| | | | | | |
| | | | | | |
- Every threshold is observable, not a matter of mood.
- Every checkpoint has a named owner who calls it.
- Thresholds change only on the record, with a reason.
7Decision and Responsible No-Go Script
DecisionProceed to design · Fund discovery · No-go
Decision owner and dateName and date
ReasonThe specific condition from this board, not a general impression.
What would change itThe condition that would reopen the decision, or "final".
If the decision is no: six steps
| Step | Done? | Notes |
| 1. Decide early, as soon as a blocking condition is confirmed | | |
| 2. Say it plainly, in one sentence, near the start | | |
| 3. Give the reason: the failed condition, with evidence | | |
| 4. Say what would change it (or that it is final) | | |
| 5. Offer a useful next step you can actually deliver | | |
| 6. Record the decision, reason, owner and reopening condition | | |
Signed off by (sponsor or decision owner)Name and date
Next checkpointDate