Consider an illustrative architecture review board asked to choose between two designs for a new payments service. Option A runs in two regions with automatic failover. Option B runs in one region with a tested restore. The presenting team describes A as "more resilient" and B as "more cost-effective", and asks the board to rate both.
The board cannot do it honestly. Nobody has said how long the service may be unavailable, how much recent data the business could lose, how fast a payment must be confirmed at month-end peak, or how many mismatched payments are acceptable in a day. Without those numbers, "more resilient" is true and unhelpful: more resilient than what is needed, or not enough? The board rates on instinct, and the decision is reopened after the first incident.
A design can only be rated against tolerances the business has set in advance, so every architecture review should start with measurable targets for availability, latency, recovery and integrity, and should record "cannot rate" wherever a target is missing rather than guessing.
Fitness needs a target
"Fit" is a relationship between a design and a need. A design with a four-hour recovery time is excellent for a monthly reporting tool and inadequate for a payments service. The same design can pass or fail depending only on the target, which is why rating without targets measures the reviewers' preferences rather than the design.
CloudNala has explained the vocabulary elsewhere: SLOs and error budgets in plain English for availability and latency, and A backup is not restore confidence for recovery point and recovery time. Architecture fitness functions for the modular monolith covers automated checks that keep a built system within its structural rules. This part is about the earlier moment: the design review, before anything is built, when the targets should be on the table and often are not.
The Architecture Fitness Card
The decision tool for this part is a card with one row per tolerance. The business owner sets the target. The architecture team states what the design is expected to achieve and on what evidence. The review rates the gap.
| Measure | Target (set by the business owner) | Design's expected value | Evidence | Rating |
|---|---|---|---|---|
| Availability | Percentage over a stated window, measured at the user's journey | Dependency availability, failover tests | ||
| Latency | A percentile for a named journey, at a stated load | Load test, dependency latency | ||
| Peak throughput | The highest expected volume, for example month-end | Load test at peak | ||
| Recovery point | Maximum data loss the business accepts | Replication or backup design, restore test | ||
| Recovery time | Maximum time to restore the service | Rehearsed restore or failover | ||
| Integrity | Tolerance for duplicates, mismatches or lost records, and how fast differences are found | Idempotency design, reconciliation schedule | ||
| Degraded operation | What must still work when a named dependency is down | Failure-State Blueprint from part 6 | ||
| Data freshness | How old data may be when shown or used | Sync and cache design | ||
| AI quality, where used | Minimum performance on an agreed evaluation set, and maximum escalation rate | Evaluation results |
Each row gets one of four ratings:
- Meets: the design's expected value is within the target, with evidence.
- At risk: the design should meet the target, but the evidence is weak or depends on an unverified claim.
- Does not meet: the design, as drawn, cannot reach the target.
- Cannot rate: there is no target. The row goes back to the business owner as a question, not to the architects as a defect.
"Cannot rate" is the most useful rating on the card. It shows the board exactly which decisions are missing, and it stops a design from being approved on a tolerance nobody agreed.
Rating the two options
For the illustrative payments service, the board sends the card to the business owner, who sets a recovery time of one hour, a recovery point of five minutes, availability of 99.9 per cent on the payment journey over a calendar month, and a tolerance of zero unreconciled payments at the end of each day. The figures are illustrative.
With targets in place, the review changes. Option B's tested restore takes several hours, so it does not meet the recovery time, however cheap it is. Option A meets recovery on paper, but its failover has never been rehearsed, so it is at risk until it is. Neither option says how payments are reconciled after a failover, so both are at risk on integrity. The board now has a decision it can defend: proceed with A, on the condition that failover is rehearsed and reconciliation is designed before go-live.
Two further points emerged. The dependency the payment journey relies on publishes a lower availability target than the business wanted, so 99.9 per cent was not reachable without a fallback, a ceiling that the SLO article explains. And the five-minute recovery point depended on a replication feature that appeared in the Time-Sensitive Claim Register with a check date of several months earlier. Both became actions with owners.
Who sets the tolerance
Tolerances are business decisions with technical consequences. An architect can explain what each level costs and what it takes to achieve, but should not set the target alone, because the target is a statement about what the business can live with. A useful working rule: the person who will answer for the outage, the lost data or the mismatched payment sets the tolerance, and signs the card.
When a business owner says "it must always be available" or "we can never lose data", the card gives a way forward. Show the cost and design implications of two or three realistic levels, and ask for a choice. A target that is chosen, even a modest one, is more useful than an aspiration nobody can design to.
The Architecture Reality Review
This is the last part of the series, and the card is the final section of the Architecture Reality Review. Together, the eight sections test whether a design will survive contact with the real environment:
- Problem-to-Intervention Trace: is the design aimed at the operating failure, and does every component point back to it? (Part 1)
- Existing-Investment Reuse Map: does it use what the organisation already owns? (Part 2)
- Decision Authority Boundary: does authority stay deterministic where it should? (Part 3)
- Direct-Service vs AI Route Matrix: is the model only where it adds interpretation? (Part 4)
- Time-Sensitive Claim Register: is every vendor fact dated and sourced? (Part 5)
- Failure-State Blueprint: does every change have pending, retry, rollback and escalation contracts? (Part 6)
- Control Semantics Review: does every label have a mechanism? (Part 7)
- Architecture Fitness Card: is the design rated against agreed tolerances? (this part)
A design does not need perfect answers in every section. It needs honest ones, with the gaps visible and owned.
What this means for South Africa
Many South African organisations design for conditions that larger markets treat as unusual: fewer local cloud regions, longer network paths to some services, power and connectivity interruptions at the edge, and peaks driven by month-end, grant payment dates or registration deadlines. These conditions make tolerances more important, not less. A target set with local conditions in mind, and rated honestly, is how a design survives them.
Previous: Part 7, A label is not a control. All parts are on the series page. The same discipline of recording evidence and reusing what works continues in Your architecture patterns need evidence, in The Learning Enterprise.
Sources and limits: this part is CloudNala analysis. The payments scenario, its targets and its findings are composite and illustrative, not benchmarks. The Architecture Fitness Card and the Architecture Reality Review are original CloudNala frameworks. Prepared on 24 November 2026.
How CloudNala can help
CloudNala runs Architecture Reality Reviews before designs are committed. We work with business owners to set the tolerances, rate each option on the Architecture Fitness Card, mark "cannot rate" where decisions are missing, and take the design through all eight sections of the review, so that the board approves a design with known gaps and named owners rather than a diagram.
Work with CloudNala
CloudNala helps organisations move from technology ambition to practical execution across cloud, AI, data, platform engineering and digital services.
Whether you are exploring AI, modernising your cloud environment, building a public-sector digital service, or turning an idea into a working MVP, we can help you shape the roadmap and deliver the next step.
Book an Architecture Reality Review or write to us at consult@cloudnala.co.za